Nexeed
    • Introduction
    • User Manual
      • General descriptions
        • Result lists
        • Scope Concept
      • Basic setup
        • Connection management
        • Scope Management
          • Configuration Scopes
          • Reporting Scopes
      • Traceability
        • Types of evaluations
        • Search Forms for creating an evaluation
        • Part Protocol
          • Quick Search
          • Extended Search
          • Part View
          • Process View
          • Component View
          • Part Information
          • Process Information
        • Forward Search
          • Quick Search
          • Extended Search
        • Backward Search
        • Tool Usage
        • Packaging Information
          • Quick Search
          • Extended Search
      • Archiving
        • Enable archiving
        • Monitoring
      • Quality Gate
        • Types of Quality Gate Checks
        • Working with Test Specifications
        • Testing of Test Specifications
          • Basic test client
          • Expert test client
          • JSON based test client
      • Terms and definitions
        • Archiving states
        • Connection states
        • Measurement state
        • Packaging data
        • Part blocks
        • Part data
        • Part states
        • Part type
        • Process data
        • Process states
        • SPC session data
        • Test Specifications
    • Developer documentation
      • Quality Gate Checks
        • Block Lists
    • API documentation
      • Data Browser HTTP API
      • Data Collector HTTP API
      • Quality Gate HTTP API
      • Archiving Bridge Adapter HTTP API
Part Traceability
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • AGV Control Center
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Direct Data Link
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator

Nexeed Learning Portal

  • Part Traceability
  • User Manual
  • Terms and definitions
  • Process data

Process data

Process Data provides detailed information about the results and measurements generated during the production process.

List of available definitions

Name Description

Facility

Facility designation

Facility ID

Identification number of a facility

Machine Number

Number of the machine with which a part was processed

Process Number / Process ID

Number of the process with which a part was processed

Process Name

Process name

Rework

Indicates whether the part has undergone rework.

Process Date

Process end date and time

Processing Time

Duration of the processing process

Shift

Designation of the shift

State Test

Result status of a test

Test Date

Date of the test

Timestamp

The exact time when the process data was recorded.

NOK Bit

Number of NOK bits

Error Number

Number of individual errors

Count

Number of errors

Work Cycle

The number of passes that a part has completed at the same station.

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses