Nexeed
    • Introduction
    • User manual
      • Type groups and types tab
        • Description of the interaction elements for type groups
        • Search for type group
        • Create type group
        • Edit type group
        • Deleting a type group
        • Display types of a type group
      • Target cycle times tab
        • Description of the interaction elements for target cycle times
        • Search for type group
        • Select equipment
        • Select time stamp
        • Filter type groups with target cycle time
        • Edit target cycle times
        • Delete target cycle time history
        • Configure columns
        • Display target cycle time history
      • Target values tab
        • Description of the interaction elements for setpoints
        • Search for type group or KPI
        • Select equipment
        • Select display mode
        • Select KPI element or type group
        • Select time stamp
        • Filter type groups or KPI elements with target values
        • Edit target values
        • Delete target value history
        • Display target value history
      • Downtime causes tab
        • Description of the interaction elements for downtime causes
        • Search for downtime causes
        • Filter downtime causes
        • Removing duplicates
        • Create downtime cause
        • Edit downtime cause
        • Delete downtime cause
        • Edit translations
        • Import downtime causes
        • Export downtime causes
        • Configure columns
      • Configuration tab
        • System configuration section
        • Auto-insert station error section
        • Downtime Text Templates section
        • Event block list section
        • Facility management area
    • API documentation
    • Glossary
Shopfloor Management Administration
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Reporting Management
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • AGV Control Center
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Direct Data Link
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator

Nexeed Learning Portal

  • Shopfloor Management Administration
  • User manual
  • Downtime causes tab
  • Edit downtime cause

Edit downtime cause

Prerequisites

  • Administration Admin role

  • The Downtime causes tab opens. Downtime causes tab

Procedure

  1. Search for or filter for downtime cause. Search for downtime causes , Filter downtime causes

  2. Select the downtime cause by activating the checkbox at the beginning of the row.

  3. Click mdm_edit_icon.

    The Edit downtime cause dialog opens. The General tab is active.

  4. Make changes (see Create downtime cause )

  5. Click Save.

The changes to the downtime cause are saved.

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses