Select equipment
Prerequisites
-
Administration User
orAdministration Admin
role -
The Target cycle times tab opens. Target cycle times tab
Procedure
Select the desired production line from the Facility drop-down list.
The target cycle times of the type groups of the selected production line are displayed.