Select equipment
Prerequisites
-
Administration: UserorAdministration: Adminrole -
The Cycle Times tab opens. Cycle Times tab
Procedure
Select the desired production line from the Facility drop-down list.
The target cycle times of the type groups of the selected production line are displayed.