Nexeed
    • Introduction
    • User manual
      • Machine Maintenance
      • Tool Maintenance
      • Machine Task Templates
      • Tool Task Templates
      • Schedules
      • Configuration
        • General
        • ERP
        • Task templates
        • Result classifications
        • Bosch Cognitive Service
      • Working with tasks
        • Using the Kanban view for tasks
        • Corrective Task
        • Preventive Task
      • Using task templates
        • Machine task template
        • Tool task template
      • Filter and search functions
    • Developer documentation
      • How-Tos
        • Embedded views
        • Dialog views
    • API documentation
      • HTTP API
    • Glossary
Maintenance Management
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • AGV Control Center
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Direct Data Link
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator

Nexeed Learning Portal

  • Maintenance Management
  • User manual
  • Configuration
  • General

General

The Maintenance Management > Configuration > General tab contains the general settings.

Apply any configuration change with Save.

Group | Element / Icon Description

Working Time Confirmation | Description Mode

The following description modes are available:

  • Always

    A description must be entered for confirming working times.

  • Optional

    A description may be entered for confirming working times.

  • Never

    Description input field is not shown at all for confirming working times.

Corrective Maintenance Task | Default Priority

Defines the priority which is used by default for new corrective tasks:

  • Low

    Corrective task is set to low priority by default.

  • Medium

    Corrective task is set to medium priority by default.

  • High

    Corrective task is set to high priority by default.

Corrective Maintenance Task | Allow to change priority

Defines whether user can change the default priority:

 

mm_switch_enabled

User can change the default priority.

mm_switch_disabled

User cannot change the default priority.

Corrective Maintenance Task | Malfunction Prefix

Defines the prefix which is displayed in front of malfunction ids.

Preventive Maintenance Task | Planned Maintenance Prefix

Defines the prefix which is displayed in front of planned maintenances.

Tenant Time Profile | Timezone

Defines the timezone for the plant.

Tenant Time Profile | First Day Of Week

Defines the first day of the week for the plant.

Working Shifts | Early Shift

Defines the time range for the early shift of the plant.

Working Shifts | Late Shift

Defines the time range for the late shift of the plant.

Working Shifts | Night Shift

Defines the time range for the night shift of the plant.

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses