Nexeed

Shift Book

    • Introduction
    • User manual
      • Role Management: Restricting Access Rights for Lines
      • shift_book_tab:index.adoc
        • shift_book_tab:show_hide_detailed_view.adoc
        • shift_book_tab:downtimes.adoc
        • shift_book_tab:shifts.adoc
        • shift_book_tab:test_runs.adoc
        • shift_book_tab:digital_shift_information.adoc
        • Shift types tab
        • Hierarchical Calendar Tab
      • Hourly quantity tracking
    • API documentation
      • HTTP API
      • Event API
    • Glossary
Shift Book
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Reporting Management
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • AGV Control Center
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Direct Data Link
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator
Nexeed Learning Portal
  • Shift Book
  • User manual
  • shift_book_tab:index.adoc
  • shift_book_tab:test_runs.adoc
✎

Test runs

Parts produced during a test run are test parts. They are not taken into account in the evaluations (e.g. hourly quantity tracking) and in the evaluations of KPI reporting.

Add a test run

Prerequisites

  • Shift Book Leader or Shift Book Admin role

  • The Shift book tab is open. Shift book tab.

Procedure

  1. Click add_border.

    If a time range has been selected in the calendar before add_border is clicked, this time range is automatically applied.

  2. Select the Add test run option.

    The Test parts production management dialog opens.

    Testteileproduktionsmanagement Dialog
  3. Enter data.

  4. Click Add.

The added test run is displayed in the calendar overview. A colored bar indicating Test run active is displayed.

Edit test run

Prerequisites

  • Shift Book Leader or Shift Book Admin role

  • The Shift book tab is open. Shift book tab.

Procedure

  1. Double-click the test run.

    Or:

    Click the test run, then click mdm_edit_icon.

    The Test parts production management dialog opens.

    sb_dialog_testpartproduction_management_edit
  2. Make changes.

The test run is changed.

Delete test run

Prerequisites

  • Shift Book Leader or Shift Book Admin role

  • The Shift book tab is open. Shift book tab.

Procedure

  1. Double-click the test run.

    Or:

    Click the test run, then click delete.

    The Remove test run? dialog opens.

    Testlauf entfernen Dialog
  2. Click Delete.

The colored bar Test run active is hidden and the test run ends.

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses