Nexeed
    • Introduction
    • User manual
      • KPIs in the Global Production Overview module
      • Global production overview
        • Overview: Map Tab
        • Overview: Comparison tab
        • Overview: Favorites Tab
        • Configuration of Global Production Overview module
    • Developer documentation
      • Concepts
      • Getting started
      • How-to
        • Registering GPO as a new Multitenant Access Control module
        • Requesting an access token
        • Work with data publisher messages
    • Operations manual
      • Overview
      • System Architecture and Interfaces
      • System Requirements
        • Global Production Overview
      • Migration from Previous Versions
      • Setup and configuration
        • Helm Configuration
        • smc/global-production-overview
        • Setting up the replication
        • Service-to-service configuration
        • Recommendations
      • Start and Shutdown
      • Regular Operations
      • Failure Handling
      • Backup and Restore
      • Logging and Monitoring
      • Known Limitations
    • API documentation
      • HTTP API
      • Event API
    • Glossary
Global Production Overview
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator

Nexeed Learning Portal

  • Global Production Overview
  • Operations manual
  • Start and Shutdown
preview 2026.01.00

Start and Shutdown

On startup, GPO will execute the following steps:

  1. Connect to DB

  2. Migrate tables if necessary

Once this has been done, it will then run the following tasks in parallel, these should not block the application if they fail but essential bits of functionality might not work.

  • Set up/resume Quartz jobs

  • Register roles and resources in MACMA

  • Register in Portal

  • Register in RabbitMQ for the integration events

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses