Nexeed
    • Introduction
    • Concepts
      • Packages
      • Process Flow
      • Package execution modes
      • Retry Processing
      • Log retention period
      • Connectors
      • Converters
    • User manual
      • Configuration
        • Connector and Orchestrator Packages tabs
        • Value Converters tab
      • Monitoring
        • Message Log tab
        • Orchestrator Log tab
    • Operations manual
      • Overview
      • System architecture and interfaces
      • System requirements
        • Required infrastructure resources
        • Required infrastructure services
      • Migration from previous versions
      • Setup and configuration
        • Helm configuration
        • Environment variables
        • Horizontal scalability
        • Permission and roles
      • Start and shutdown
      • Regular operations
      • Failure handling
        • Application exit codes
        • Authorization troubleshooting
      • Backup and restore
      • Logging and monitoring
      • Known limitations
    • Developer guide
      • Getting started
      • How-to
        • Call ERP Connectivity
        • Create a Connector Package
        • Create an Orchestrator Package
        • Execute an Orchestrator Package through Solace
        • Handle execution result events
    • API documentation
      • API v1
      • API v2
    • Glossary
ERP Connectivity
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator

Nexeed Learning Portal

  • ERP Connectivity
  • Operations manual
  • Regular operations
preview 2601.0.0

Regular operations

As the product ERP Connectivity does not have any business logic itself, this is highly dependant on the Connector Packages or Orchestrator Packages in use. Please refer to the individual documentations.

Tenant deletion

It is a legal requirement to delete all module relevant data for a tenant if the tenant gets removed, but it is up to the local laws how long the data must be kept afterwards, it is the responsibility of the OPS-team to accomodate to the local laws on when to actually delete the data from the database.

ERP Connectivity supports automated deletion of tenants as soon as they get deleted in MACMA.

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses