Nexeed

Maintenance Management

    • Introduction
    • User manual
      • Machine Maintenance
      • Tool Maintenance
      • Machine task templates
      • Timing plans
      • Tasks
        • Corrective Task
        • Preventive task
      • Task templates for machines
      • Filter and search functions
    • Developer documentation
      • How-Tos
        • Embedded views
        • Dialog views
    • API documentation
      • HTTP API
    • Glossary
Maintenance Management
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Reporting Management
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • AGV Control Center
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Direct Data Link
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator
Nexeed Learning Portal
  • Maintenance Management
  • User manual
  • Timing plans
✎

Timing plans

The Maintenance > Schedules menu displays the schedules for the task templates. Schedules can be created to automatically create preventive tasks. For example, a schedule can be used to create a preventive task on every second Monday of a month. The overview can be filtered in several ways. Favorites can be created to display schedules that are relevant to a device.

MainM_timeplan_overview_2023_01

Header

Element/icon Description

Equipment

Filter by device.

Enter the name of the device in full or in part.

<nn> entries

Number of schedules displayed

Search search

Search for a schedule.

Enter the name of the schedule in full or in part.

o223627 Filter

Filter schedules in the overview.

o223628

Create or configure a schedule for a machine task template.

Table

Element/icon Description

Schedule

Brief description of the schedule

Device

Names of the assigned devices or device types

Task template

Name of the assigned task template

Trigger

Execution interval of the schedule

  • Continuous

A preventive task is created every <nn> minute(s) , hour(s), day(s), week(s), month(s) or year(s) , regardless of the time, day, month or year.

  • Calendar

Minute interval

A preventive task is created every <nn> minutes.

Hourly interval

A preventive task is created every <nn> hours.

Weekly interval

A preventive task is created every <nn> weeks on the set days of the week.

Monthly interval

Every <nn> months, a preventive task is created on the set day.

Annual interval

A preventive task is created every <nn> years.

Status

Status of the schedule

Active

Preventive tasks are created with the set Trigger.

Inactive

Preventive tasks are not created with the set Trigger.

Created by

User who created this schedule

Created on

Date on which the schedule was created

Last update

Date on which the schedule was last updated

delete

Delete schedule.

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses