Nexeed
    • Introduction
    • User manual
      • Machine Maintenance
      • Tool Maintenance
      • Machine Task Templates
      • Tool Task Templates
      • Schedules
      • Configuration
        • General
        • ERP
        • Task templates
        • Result classifications
        • Bosch Cognitive Service
      • Working with tasks
        • Using the Kanban view for tasks
        • Corrective Task
        • Preventive Task
      • Using task templates
        • Machine task template
        • Tool task template
      • Using schedules
      • Filter and search functions
    • Operations manual
      • Overview
      • System Architecture and Interfaces
      • System Requirements
        • bci-app/nginx
        • maintenance-management/mm-service
        • mm/mm-connector-sparepart
      • Migration from Previous Versions
        • Resources mapping from MES to IAS
      • Setup and Configuration
        • Configuration of the helm chart
        • MM Connector Spare Part
        • ERP Connector & Orchestrator Packages
      • Start and Shutdown
      • Regular Operations
      • Failure Handling
      • Backup and Restore
        • Tenant restore
      • Logging and Monitoring
        • Module Health Endpoints and K8S Probes
      • Known Limitations
    • Developer documentation
      • How-Tos
        • Embedded views
        • Dialog views
    • API documentation
      • HTTP API
      • Async API
    • Glossary
Maintenance Management
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • AGV Control Center
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Direct Data Link
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator

Nexeed Learning Portal

  • Maintenance Management
  • Glossary
preview 2.6

Glossary

IAS

short for Nexeed Industrial Application System

Instruction

Is one specific step to maintain / repair an issue defined in the task.

MACMA

Nexeed IAS Multitenant Access Control

MDM

Master Data Management

MES

short for Manufacturing Execution Systems

MM

Abbreviation of Nexeed Maintenance Management

MMC

short for MM Connector

MMPD

Old alias for Master Data Management (MDM)

RabbitMQ

Open-source message broker

RDBMS

short for Relational Database Management System

Solver Group

The group which solves technical problems (e.g. a group of mechanics, a group of electricians, etc.). These groups are tagged to determine which tasks they are suitable for.

Task

A task within maintenance of none or multiple instructions. A task addresses a concrete problem to be solved.

Tenant

Tenants represent the customers in a multi-tenancy architecture in which a single instance of a software application serves multiple customers.

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses