Diese Seite ist nur auf Englisch verfügbar.

Productivity

The Productivity report shows the productivity trend over time. The productivity is calculated from the ratio of the number of good parts and the number of worker hours.

kpi_report_general_productivity

Legend

Click on the elements in the legend to show or hide them. Hidden elements are grayed out in the legend and the preceding icon is rotated.

Element Description

Productivity Direct and Indirect

Productivity trend over time

Average

Arithmetic mean value of Productivity

Target Value

Productivity to be achieved

Intervention Limits

Validity range for the setpoint. Action must be taken if the validity range is undershot or exceeded. If this is the case for the selected past period, alert-error-filled is displayed for this period.

Diagram options

Element Description

Display

Productivity based on:

  • Direct and indirect employees (defined in the Shift Book module)

  • Productivity Direct (WPD): These workers are always working on the line.

  • Productivity Indirect (WPI): These workers are assigned to a line as needed.

Split Days Into Shifts

When activated, the productivity per shift is displayed.

Only when selecting the Grouping by time report and only when grouping by day (e.g. one month as the time range).

Edit this pageDiese Seite bearbeiten

Feedback on this pageFeedback zu dieser Seite