Changeovers reports

The Changeovers tab shows the production periods by types and the corresponding calculated Changeover Gap for the line over a specific time period.

kpi_view_changeovers

Legend

Click on the elements in the legend to show or hide them. Hidden elements are grayed out in the legend, and the preceding icon is rotated.

Element Description

Production Duration

Duration of production of a type

Changeover Gap

Duration of the changeover gap for a type

Changeover gap

The Changeover Gap for a production line is the calculated time that a changeover of the whole line would theoretically have taken. It is based on a complex algorithm and takes into account, among other things, the changeover times of each facility of the line, but cannot always be calculated. The changeover time of the last facility is used as a fallback.