Nexeed

Stock Management

    • Introduction
    • User manual
      • Unit load types
      • Materials
      • Kanban Control Loops
      • Supermarkets
        • View Supermarkets
        • Setting Up a Supermarket
        • Managing a Supermarket
        • Checking and Correcting Stock
      • Stock Changes
      • Scanner
      • Readers
      • Error Messages and Remedy
    • API documentation
      • Communication Hub
      • Devices Management
      • Logistics Master Data
      • Stock Management
Stock Management
  • Industrial Application System
  • Core Services
    • Block Management
    • Deviation Processor
    • ID Builder
    • Multitenant Access Control
    • Notification Service
    • Reporting Management
    • Ticket Management
    • Web Portal
  • Shopfloor Management
    • Andon Live
    • Global Production Overview
    • KPI Reporting
    • Operational Routines
    • Shift Book
    • Shopfloor Management Administration
  • Product & Quality
    • Product Setup Management
    • Part Traceability
    • Process Quality
    • Setup Specs
  • Execution
    • Line Control
    • Material Management
    • Order Management
    • Packaging Control
    • Rework Control
  • Intralogistics
    • AGV Control Center
    • Stock Management
    • Transport Management
  • Machine & Equipment
    • Condition Monitoring
    • Device Portal
    • Maintenance Management
    • Tool Management
  • Enterprise & Shopfloor Integration
    • Archiving Bridge
    • Data Publisher
    • Direct Data Link
    • Engineering UI
    • ERP Connectivity
    • Gateway
    • Information Router
    • Master Data Management
    • Orchestrator
Nexeed Learning Portal
  • Stock Management
  • User manual
  • Kanban Control Loops
✎

Kanban Control Loops

Overview: Kanban Control Loops

Kanban control loops are created and edited under Material flow data > Kanban control loops. Kanban control loops control the material flow. A Kanban control loop is defined by the sum of the assigned Kanban cards.

Kanban_Regelkreise_Uebersicht
Element/icon Description

<nnnn> or <nn/nnnn>

Number of Kanban control loops that meet the filter criteria or number of selected Kanban control loops/number of Kanban control loops that meet the filter criteria

Supermarket

Filter by a supermarket.

Material number

Filter by a material number.

Load unit types

Filter by a load unit type.

filter

Update the view.

import

Import Kanban control loops.

Importing an Excel file for Kanban Control Cycles

document-save-to

Export template for Kanban control loops.

Downloading an Excel file as a Template for Kanban Control Loops

mdm_edit_icon

Header: no function

List entry: Editing Kanban control loop.

Creating or Editing Kanban Control Loops

delete

Header: Delete all selected Kanban control loops.

List entry: Delete Kanban control loop.

Deleting a Kanban Control Loop

add_border

Add Kanban control loop.

Creating or Editing Kanban Control Loops

checkbox-default or checkbox-default-checked

List title bar: Select or deselect all displayed Kanban control loops.

List entry: Select or deselect Kanban control loop.

Creating or Editing Kanban Control Loops

Prerequisite

Transport management administrator or Transport management logistics planner or Stock management administrator or Stock management logistics planner role

Procedure

  1. Open the Material flow data > Kanban control loops menu.

    Kanban_Regelkreis_bearbeiten_Haupt
  2. In the header, add a new Kanban control loop with add_border.
    Or:
    In the row containing the Kanban control loop, open the Kanban control loop with mdm_edit_icon for editing.

    Neuen_Kanban_Regelkreis_anlegen
  3. Enter or change information:

    • Name
      Name of the Kanban control loop

    • Supermarket
      Name of the supermarket

    • Material number
      ID of the material

    • Load unit types
      Name of the unit load type

    • NPK (number per Kanban)
      Number of parts per Kanban card

    • Minimum stock
      Minimum stock of Kanban cards in the supermarket

The value must be met. If the limit is undershot, a white arrow pointing downward is displayed on the relevant track or storage location in the supermarket under Material flow > Supermarkets.
Graphical representation

  • Maximum stock
    Maximum stock of Kanban cards in the supermarket.

    The value must not be exceeded. If the limit is exceeded, a white arrow pointing upward is displayed on the relevant track or storage location in the supermarket under Material flow > Supermarkets.
    Graphical representation

    1. Select the Kanban cards tab.

      Neuen_Kanban_Regelkreis_anlegen_Kanban_Karten
    2. If necessary, assign a Kanban card to the Kanban control loop with Kanban cards (<n>) add_black.

    3. Enter or change the designation of the Kanban card.

    4. If necessary, delete the Kanban card with delete.

    5. Create the Kanban control loop with Save or accept the editing.

The new or edited Kanban control loop appears under Material flow data > Kanban control loops.

Deleting a Kanban Control Loop

Prerequisite

Role Transport Management Administrator or Transport Management Logistik Planer or Stock Management Administrator or Stock Management Logistik Planer

Procedure

  1. Open the Material flow data > Kanban control loops menu.

    Kanban_Regelkreis_bearbeiten_Haupt
  2. If necessary, filter by a Kanban control loop.

  3. Delete Kanban control loop:

    • To delete a Kanban control loop, click on delete in the row for that Kanban control loop.

    • To delete multiple Kanban control loops, enable the check boxes of the Kanban control loops and click delete in the header.

    • To delete all displayed Kanban control loops, enable the checkbox in the title row of the list and click delete in the header.

  4. In the Kanban control loop dialog window, click Delete to permanently delete.

The Kanban control loop is deleted and removed from the list of Kanban control loops.

Downloading an Excel file as a Template for Kanban Control Loops

A Kanban control loop can be downloaded as a template in the form of an Excel file (".xlsx"). The export can be edited and then imported back into the Stock Management module.

Importing an Excel file for Kanban Control Cycles

Prerequisite

Role Transport Management Administrator or Transport Management Logistik Planer or Stock Management Administrator or Stock Management Logistik Planer or Stock Management Fertigungsmitarbeiter

Procedure

  1. Open the Material flow data > Kanban control loops menu.

    Kanban_Regelkreise_Uebersicht
  2. In the header, use document-save-to to open the dialog box Open CanbanControlCycleTemplate.xlsx.

  3. Click Save file.

  4. Export the template with OK.

The exported template is stored in the web browser’s Downloads folder.

Importing an Excel file for Kanban Control Cycles

Kanban control loops can be imported into the Stock Management module in a CSV file (e.g. Excel).

Preconditions

  • Role Transport Management Administrator or Transport Management Logistik Planer or Stock Management Administrator or Stock Management Logistik Planer

  • There is an Excel file with Kanban control loops:

    • For example, in the form of a downloaded template that has been filled in
      Downloading an Excel file as a Template for Kanban Control Loops

    • The file contains the following columns: Control cycle number ; Material ; Material short text ; Kanban MinEmpty ; Kanban MaxEmpty ; Quantity per Kanban ; Number of Kanbans ; ID number ; ProdSupplyArea ; PSA designation ; UnitLoadType

    • The columns Control loop number , Material , Kanban MinEmpty , Kanban MaxEmpty and PVB designation (supermarket) are filled out.

Procedure

  1. Open the Material flow data > Kanban control loops menu.

    Kanban_Regelkreise_Uebersicht
  2. Use import to open the file manager and import the Excel file containing the Kanban control loops.

  3. Select the file to be imported (Excel format .csv) and import with *Open.

The Kanban control cycles are automatically created or updated and appear in the Kanban control cycles dialog box. A log of the Kanban control cycle import also appears.

+ image::sm_imported_kanban_card_22.png[sm_imported_kanban_card_22]

Contents

© Robert Bosch Manufacturing Solutions GmbH 2023-2025, all rights reserved

Changelog Corporate information Legal notice Data protection notice Third party licenses